Skip to main content

Table 5 Exchangeable cations and cation exchange capacity and base saturation of soils at CSB

From: Characterizing soils and the enduring nature of land uses around the Lake Chamo Basin in South-West Ethiopia

Ped on

Depth (cm)

Na

K

Ca

Mg

Sum

CEC

PBS (%)

Exch. bases

(cmol(+)/kg)

Ca/Mg

Mg/K

Ca+Mg/K)

Kulfo Watershed = Upper Chamo Basin (UCB)

 P-1

0–34

1.03

0.45

26.78

9.94

38.21

38.97

98.03

2.70

22.09

80.40

34–200

1.40

0.11

22.90

8.21

32.61

36.63

89.05

2.79

74.64

282.82

 P-2

0–90

1.16

0.51

16.57

9.16

27.39

34.12

80.27

1.81

17.96

50.45

90–97

–

–

–

–

–

–

–

–

  

97–200

1.78

0.41

22.88

13.64

38.71

39.70

97.51

1.68

33.27

89.07

 P-3

0–80

0.60

0.55

26.54

8.99

36.68

37.68

97.33

2.95

16.35

64.60

80–85

–

–

–

–

–

–

–

–

  

85–200

0.71

0.41

22.68

10.27

34.07

38.15

89.31

2.21

25.05

80.37

Sille-Sego Watershed = Middle Chamo Basin (MCB)

 P-4

0–35

0.73

0.64

25.49

9.07

35.93

39.44

91.09

2.81

22.12

84.29

35–200

1.14

0.31

28.34

6.98

36.77

37.44

98.20

4.06

22.52

113.94

 P-5

0–40

1.12

0.49

20.54

9.84

32.00

35.36

90.50

2.09

20.08

61.92

40–200

1.04

0.46

27.90

6.10

35.51

36.49

97.32

4.57

5.87

32.69

 P-6

0–50

0.82

0.28

23.97

8.99

34.05

34.43

98.92

2.67

32.11

117.71

50–58

–

–

–

–

–

–

–

–

  

58–200

0.85

0.20

25.06

6.91

33.02

35.69

92.52

3.63

8.13

37.61

Waseca-Doyso Watershed = Lower Chamo Basin (LCB)

 P-7

0–46

1.17

0.66

37.58

16.42

55.84

56.35

99.10

2.29

24.88

81.82

46–140

1.97

1.13

34.44

15.70

53.25

54.03

98.56

2.19

13.89

44.37

 P-8

0–30

0.89

1.19

32.83

8.64

43.55

44.61

97.63

3.80

7.26

34.85

30–120

1.05

0.20

33.38

1.28

35.92

37.68

95.31

3.26

6.40

123.79

120–200

1.04

0.25

19.32

4.62

25.23

28.30

89.15

4.18

18.48

95.76

 P-9

0–50

1.16

0.95

32.26

9.86

44.22

47.23

93.61

3.27

10.38

44.34

50–54

–

–

–

–

–

–

–

–

  

54–200

1.05

0.20

28.94

8.64

38.84

39.91

97.30

3.35

43.20

187.90

Arguba-Wezeka Watershed = Toe Chamo Basin (TCB)

 P-10

0–30

1.27

0.60

21.83

8.99

32.69

35.36

92.47

2.43

14.98

51.37

30–80

1.00

0.29

23.76

9.68

34.74

37.30

93.12

2.45

33.38

115.31

80–200

0.85

0.64

23.54

6.98

32.01

33.65

95.13

3.38

10.91

47.69

 P-11

0–46

0.46

0.73

22.03

10.80

34.02

38.03

89.44

1.21

14.79

44.97

46–115

0.74

0.41

17.98

11.13

30.25

31.63

95.61

2.32

27.12

71.00

115–200

0.82

0.50

20.80

6.66

28.78

28.94

99.45

2.84

13.32

54.92

 P-12

0–17

0.77

0.59

12.53

7.34

21.23

33.34

63.68

2.31

12.44

33.68

17–70

1.38

1.05

17.71

12.10

32.24

33.34

96.71

4.14

11.52

28.39

70–200

1.98

0.22

18.58

11.23

32.01

35.22

90.90

5.63

51.05

135.68

  1. Note: It is difficult to indicate statistical difference as the depth of each profile sampled was different